Photo Gallery

First railroad, 2008-10  Smokey Timber Logging Co.  1:

Second railroad, 2010-11.  Smokey Timber Logging Co.  2:






Third railroad in late December of 2011:




March 17, 2012


Finally, I have something to look at, the pond!



 Here is the rock "tunnel"  it is more of a monument though.
The first tracks are down and ready to be wired.

April 9, 2012
First TRAIN!!!

 The first train comes into the saw mill area.
 All these logs were just cut from real wood.  this is a great, cheap, eco-friendly way to fill those log cars.  All of these logs also came off of already dead trees.  Later on, I hope to have 3-4 times as many logs on the  railroad.
 The view from above sets the whole scene, and shows building placement.
 Later in the day, I realized I needed to have a small yard to switch out log cars.

And here is a view from the other side of the line.  The water tower is in place, as well as the station (far left) and the general store (not seen).